by Luca Colantuono | Jun 11, 2024 | News, Non categorizzato
Geotechnical in situ test, Geophysical survey and geological report for Infrastructures development project railway spur Sidvokodvo –...
by Luca Colantuono | Jun 11, 2024 | News, Non categorizzato
ZAMBIA – ZIMBABWE REPUBLIC Feasibility, Preliminary and Detailed Engineering Design of the Kafue-Lion’s Den Railway Spur (Zambia-Zimbabwe) Geotechnical and Geophysical in situ test survey, geological report
by Luca Colantuono | Jun 11, 2024 | News, Non categorizzato
Geophysical investigation, section Dunkwa-Awaso “Consulting Services for the Front-End Engineering Design, Final Design and Construction Supervision of the Western Railway Line” May...
by Luca Colantuono | Jun 11, 2024 | News
Accelerometric and inclinometer remote monitoring of the cracks at dock, ENL terminal, Lagos port complex, Apapa Port, Lagos (Nigeria)
by Geo Logica Italiana | Sep 28, 2023 | News
In November 2018 our company had the honour to perform structural tests at the British Embassy in Vienna (AT). Single horizontal flat jack and in-place shear tests were performed on the masonry walls. Single horizontal flat jack test scope is to determinate the...
by Geo Logica Italiana | Sep 28, 2023 | News
Our company performed preliminary geophysical surveys for the engineering design of two railway spurs in the Republic of Cameroon: the Édéa-Kirbi-Campo (South) and the Douala-Limbé-Idenau (South-West) tracks, that will help to link the main cities of this Country. We...